Rothesay Pier, Isle of Bute

Public Infrastructure Lift Solution – Delivered with Classic Lift (2025)

Overview

Lester Controls worked with Classic Lift to deliver a robust hydraulic lift solution for Rothesay Pier, supporting public access to ferry services in a challenging coastal environment.

The Challenge

Public infrastructure projects require:

  • High durability and reliability

  • Adaptability to changing environmental conditions

  • Safe and efficient passenger flow

  • Integration with non-standard structural movement

In this case, the lifts needed to accommodate a moving upper platform level, adding complexity to system design and operation.

The Solution

Lester Controls provided a hydraulic control solution built around the Almega II controller, designed to deliver consistent performance despite the dynamic platform conditions.

System Specification

  • 2 x simplex passenger lifts

  • 2 stops

  • 10 person / 750kg capacity

  • Down collective control

  • Through entrance configuration

  • VF powered doors

  • Hydraulic drive system

  • Moving upper level integration

Key Features Delivered

  • Almega II controller

  • New hydraulic power units

  • Cedes positioning system

  • Full pre-wired solution

  • Speech functionality

  • TFT indication (70 & 43)

  • A3 compliance and EN81-20/50 standards

  • ECO features

  • Panel and landing test functionality

  • PB37 button package

The Result

The completed installation delivers a reliable and adaptable lift solution that supports safe public access while accommodating the unique operational challenges of a ferry platform environment.